International Expansion.

Article · January 21, 2024 · Pete Crosby

6 min read

The sun sets on a calm sea beneath bands of orange cloud.

In short.

Breaking into a new market is exceptionally hard: many leaders jump in believing no one will say no, then keep investing time, cash and resources without real signs of success. We plan launches with the Phased Launch Framework: four phases (planning, green shoots, Predictability, then business as usual), each with no more than three objectives, key results that measure success or failure, and gateway exit criteria that must be met before the next phase begins. It works for a new product or client profile as well as a new territory.

In 2005 I was sent from the UK to Boston to set up our US operation. We were a pretty young start-up & I had been hired in 2002 as the first sales rep. This was a big shift for me. Up until then I had been selling ad space, working for a magazine called PFI Journal, so this was my first proper SaaS role, although I confess none of us knew it was called SaaS back then.

Welcome to America.

In a lot of early stage start-ups, the best sales rep keeps on getting promoted. That was me - the rep with potential. By the end of 2005 I was on the leadership team and it was me that was considered the most likely to get out there & break America.

We made pretty much every mistake in the book during that period. Looking back it’s a miracle I ever sold anything. One moment in particular has stuck with me ever since - I think about it all the time. I was sat in a bar after work with the Head of Economic Development for the City of Gardner. EcDev chiefs were our prime Casualty & I was trying to close our first State-side deal. Gardner’s Head of EcDev, Rob, was a thoroughly decent white mustached veteran and he knew the game inside out.

“Rob”, I said, “we are selecting just four or five of the most progressive forward thinking municipalities in the State for the launch: the pioneers.” He took a swig of his beer. “Pete, you know the thing about pioneers? Nobody wants to go first.” I got the sale eventually but it didn’t happen that evening.

Breaking Through.

Breaking into a new market, even for start-ups that are flying, is ridiculously difficult. Far too many leaders do exactly what we did: jump in with both feet believing that their product is so paradigm shifting that no-one will ever be able to say no. The weight of this decision simply cannot be underestimated. It is exceptionally hard to execute well.

So how is it that some start-ups & scale-ups find a way to break through? After all, if you are on a strong growth trajectory, you are going to have to break out at some point.

A whole book could be written on this topic & so for the rest of this article I am going to restrict myself to what we call the Phased Launch Framework: the infrastructure that will enable you to structure your launch planning. I will come back to this topic in future articles & cover the other key subjects (beach-heads, launch techniques, hiring etc.) that comprise this make or break topic.

PR-SC-RPT.

The Phased Launch Framework itself can be used for more than just international expansion. Once you have established Predictability in your initial market, you will move on to the Scalability phase. Once you have demonstrated that putting the pedal to the metal doesn’t cause the nuts & bolts to fly off in all directions, you will start to think about the third phase - Repeatability.

I always remember this sequence as PR-SC-RPT. It is the same sequence behind everything we do at Revelesco: predictable, scalable, repeatable revenue.

  1. Predictability
  2. Scalability
  3. Repeatability

In this third phase you take what you have learned and start to apply it, typically, to one of three growth levers:

  • A new product to the existing market
    • i.e. You have learned that there is a further market opportunity that requires the development of a new product, module, bolt-on, or service
  • An iteration of the existing product to a new client profile
    • i.e. You have evidence to suggest that you could grow ARPA (Annual Revenue Per Account) by moving up from the mid-market to the enterprise market
  • The existing product to a new territory 
    • i.e. You are a US business who believes there is a similar need for your product in Europe

Phased Launch Framework.

To walk through this framework we will stick with the third growth lever. You can grab a copy of the supporting spreadsheet here.

The Framework is effective because it prevents GTM progression unless clear milestones are hit. Once you have pulled the trigger there is such a temptation to continue - to believe it will be OK - that we can end up investing valuable time, cash & resources without any significant sign of success. The Phased planning method helps resist the impulse to keep pushing on.

Each Phase has a series of Objectives, never more than three; and Key Results which quantitatively determine success or failure. Up to three projects contribute to the success of each Objective.

Crucially, you will notice that each Phase has Gateway Exit Criteria. Failing to meet these Criteria prevents passage to the subsequent Phase.

Phase 1.

Phase 1 is all about planning, and it’s pretty important planning. Why? Well, because the Gateway Criteria in particular have to be thoroughly thought through. The question I always ask myself is this: If we were just behind these goals would we still think it were wise to proceed? If the answer to that is “yes”, then the goals are wrong.

Phase 1 of the Phased Launch Framework as a table of objectives and gateway key results: a clear choice of the next market, backed by a go/no-go recommendation on the three likeliest markets; a phased GTM plan accepted by the management team; and tactical rollout plans validated by the launch team. The gateway: all three objectives must be accomplished.

There are 3 components to each Phase, and Phase 1 is the only one where you are likely to directly copy my Objectives. That is because they follow three tried & tested steps.

  1. Hypothesis - we have an evidence based idea for what comes next. It is based on the beach-head method, has been evaluated against at least two alternatives, and has a clear go/ no-go recommendation for the planning group
  2. We have built a GTM Plan & it has been validated & approved by our leadership team
  3. There is a detailed Roll-out Plan & the launch team have agreed it

Incidentally the launch team must include the CEO, a C-level exec leading the project, and representatives from Product, Demand, Sales, and Customer Success.

All three of these steps must be delivered to pass through to Phase 2.

Phase 2.

This Phase is all about the green shoots. Are we achieving the early indicators that suggest that the plan we built in Phase 1 is an effective one? In the example I suggest three Objectives:

  1. ICP demand is proven
  2. A pipeline has been built
  3. Customers have been signed
Phase 2 as a table of objectives and gateway key results: ICP demand proven (a set number of new ICP MQLs in three successive months), a validated pipeline (4x SQO coverage for the coming quarter) and success signing and delivering ICP customers (at least five live, at a minimum ARPA). The gateway: any two of the three objectives.

In other words, our offering is attractive. Upon investigation prospects deem it worthy of further validation, and they become customers.

There must be an element of practicality here. I recommend the Gateway is passed through if we can deliver on two out of three of these. Ask yourself, if we met our Key Result for numbers 2 & 3, but Demand was not quite where we wanted it to be, would we push on? Almost certainly we would choose to proceed, so achieving any two is sufficient.

Phase 3.

Early in this article we spoke about Predictability. And that’s what Phase 3 is all about. Can we move from green shoots to something longer lasting - Predictability. In the spreadsheet the examples I give are as follows:

  1. Consistent revenue generation
  2. Product Market Fit
  3. The hiring of a local team
Phase 3 as a table of objectives and gateway key results: consistent, predictable revenue and customer acquisition, clear product market fit and adoption (30-day adoption equal to the home market, with an NPS target), and a local team in place (at least three of the GM, sales, marketing and customer success leaders past their 90-day probation). The gateway: all three let the launch team scale down its involvement.

Achieving these three goals allows us to scale down the involvement of the launch team and to report to the Board that we can observe consistency.

Phase 4.

In this final phase we are aiming to move toward BAU (Business as Usual). Here we will need to measure very similar Objectives to Phase 3:

  1. Are we seeing regular quarterly growth?
  2. Do we have a satisfied customer base?
  3. Are the local team meeting the goals with minimal involvement from the Launch Team?
Phase 4 as a table of objectives and gateway key results: the new market in growth mode (a minimum quarter-on-quarter revenue growth or customer count), NPS that stays consistent under the local team, and the local leadership team meeting its first independent quarterly OKRs (all three delivered at 0.7 or above). The gateway: all three take the business out of Launch Mode and remove the launch team.

If the answer to each of these is, “yes” then we can pass through the final Gateway. We have fully established a new market, the Launch Team can turn their attention elsewhere, and we can regard the Launch as a success.

Exercise.

Think about the next big strategic choice you must make. Is it a new territory? A new product? Or moving to deliver our product to a new segment of the market? Answer these three questions for yourself:

  1. What alternatives are there? What is the business case that articulates why my preferred option is the smart move?
  2. Should I go ahead? How will I deliver on & measure the green shoots?
  3. What does early success look like? What needs to happen for us to turn our attention elsewhere & trust the local team to deliver.

Thanks for reading. If your numbers aren't where they need to be and you're not sure why, the Unit Economics Calculator sets them against 2026 benchmarks for companies your size and shows what to do next. Questions? Email pete@revelesco.com.

Questions CEOs ask next.

About the author.

Pete Crosby

Pete Crosby

CEO and co-founder, Revelesco

Pete is a revenue strategist, coach and CEO advisor, and a 4x scale-up revenue leader with 20+ years running revenue from Series A to IPO. He ran revenue at Viadeo through IPO, took Ometria to a $21M Series B in 18 months, and grew Triptease from $2M to $10M ARR. He has coached more than 100 scale-up CEOs and CROs.

Meet the Revelesco team

Read next.

See everything in Insights.

Diagnose before you prescribe.

Tell us what is happening with your revenue, and talk it through with Pete or Emily.

Wind lifting snow from a mountain ridge.

[ Revenue insights ]

Unleash Your Curiosity: Subscribe to Our Weekly Deep-Dive Newsletter!

Concise and digestible. Revenue deep-dive analysis for B2B SaaS CEOs, Founders & Revenue leaders.

Thank you! One of us will be in touch with you shortly.
Oops! Something went wrong while submitting the form.

why us

strategy

team

engage us

insights

summit

offsites

contact us